Refit of a 23FT Gaff Cutter

Deprecated: Function wp_make_content_images_responsive is deprecated since version 5.5.0! Use wp_filter_content_tags() instead. in /home/sites/jwsmarineservices.co.uk/public_html/wp-includes/functions.php on line 5414

This was our resident project during the winter of 2011 going into 2012. Her work list included stripping out cockpit and bring it back to the original, remove all deck fitting and if needed replace with bespoke bronze fittings. A new deck hatch was sourced and fitted along with a new teak deck. Engine controls and instruments were re-sited. A new galley, heads and fridge compartment was fabricated. On her hull we made fair the hull using gel coat then applied a cream white top coat and finally finished with a coat of anti-foul.

Deprecated: Function wp_make_content_images_responsive is deprecated since version 5.5.0! Use wp_filter_content_tags() instead. in /home/sites/jwsmarineservices.co.uk/public_html/wp-includes/functions.php on line 5414

© JWS Marine Services 2018. All rights reserved

Company VAT No: 838 6772 75

Company Reg No: 05180060