Owner contacted JWS as he was moored along side in the a storm and damaged had been caused from the boat bumping into the pontoon.

The bumping into the pontoon had caused internal damage to all the internal tabbing and fixing for the main bulk head.

JWS removed all the tanks and wood work, then cut away the required tabbing.

All surfaces were prepped along with all the wood work ready for re-fitting of all new tabbing.

Tabbing applied along with the installation of new through bolts got eh bulk heads and bunk, finally a new gel coat finished was applied to all worked area.