Internal Glass work to Hull
This boat required some internal glassing done to the hull, after she was lifted and the mast removed, we removed the compression post, was refitted on completion.
Tented the working area and grinded the hull back to good glass.
We then cut out the internal mouldings, these were re-fitted glass joined and re-gel and the area B&P.
We made 2 new foam girders/bulkheads, fixed them in place and glassed over,
The areas then sanded and prepped for gelling.