New Teak Deck on a Rival 41
Picture 1 shows the deck before started work.
Pictures 2 shows JWS removing the old teak from the deck.
Picture 3 This hatch is for the anchor locker top, this is fitted by hand and is solid 18mm teak, all glued individually and with sikaflex deck caulking. This will be allowed to cure for 3 days before finishing off.
Picture 4 Shows the hatch all cleaned off and with teal dowels ready for removal.
Picture 5 this shows the care taken with the new sail tracks that have been fitted to the deck, all deck fittings are fitted using sikaflex 291 this guarantees that they will not leak in the future.
Picture 6 This shows the deck finished with all deck fittings back in place ready for use.
Pictures 7/8/9/10/11 These photos are of the boat back in the water looking good.
Pictures 12 & 13 These are of the hatch we showed earlier, finished and fitted.