Galley storage Fabrication on a Grand Banks
The owner of this returning boat requested the fabrication of a galley unit.
First we removed the cooker from the area.
We then set about making 3 new doors from teak for the new galley unit to match in with originals, we then painted the insides white.
Template all and fitted the ply fiddles, we then made 3 plywood shelves, primed all and applied a top-lac paint.
JWS supplied a new microwave and the owner supplied his own induction hobs, which we made a new Formica top to fit on induction hob.
Finally we varnished all in match with existing.
Check out her other jobs carried out at JWS –
Hull Respray – Grand Banks 46Galley storage Fabrication on a Grand Banks